Skip To Main Content

Mobile Main Nav

Homepage Header

Search Container

Interior Header

Interior Logo Mobile

Header Utility

Search Container

Mobile Trigger

Sticky CTA

Landing Nav

Breadcrumb

Master Campus Plan

We are a blessed school, and God has graciously and abundantly provided a wonderful campus and tremendous facilities for over 70 years. As we look to the future, we are enthusiastic about expanding our outdoor athletic facilities, building a new athletic center, and rebuilding the middle and upper schools. With God’s blessing, a majority of this plan will be completed by the time our current kindergarteners are in the upper school. The plan provides a great roadmap for our future.

Upper School Building

Our new Upper School Building was completed in August of 2023. Click here to learn more.

The two-story Upper School Building features:

  • Around 30,000 square feet
  • 15 classrooms and four science labs
  • Broadcast room with a green screen and production office
  • Dedicated learning space and offices for the Academic Services Program
  • Office space for director of diversity and belonging and spiritual life
  • Dedicated robotics practice field
  • A senior lounge
  • An outdoor classroom
  • Solar panel monitors
  • Planting area and butterfly garden
new upper school building with blue sky
bright science classroom with windows
robotics classroom with tables
alternative seating for students

Middle School Building

Our new Middle School Building was completed in August of 2022. 

The two-story Middle School Building features:

  • More than 23,000 square feet, doubling the current middle school space
  • 13 classrooms
  • Innovations Suite of three rooms with a dedicated robotics room, a STEM fabrication lab, and a flexible classroom to use as one learning space
  • Dedicated learning space and offices for the Academic Services Program
  • Office space for both lower and middle school administration
  • Open space for student and staff collaboration

Athletic Complex for Lacrosse, Soccer & Tennis Programs

In November of 2022, we completed Phase 2 of our Master Campus Plan with the opening of the new athletic complex on the northern part of campus that includes the Harvick Field House with locker rooms for the soccer and tennis programs, bathrooms, a concession stand, and a trainer’s room. In addition to the field house, the new area also includes eight tennis courts; Guy Field, an artificial turf field for the soccer and lacrosse programs; a loop road to connect these facilities with the main campus; and additional parking areas.

Center for Worship and Performing Arts

The Center for Worship and Performing Arts (CWPA) was completed in the Fall of 2017 as part of Phase 1 of our Master Campus Plan. This two-story, 20,515 square-foot building is centrally located on campus behind the Hendrick Center for Arts and Science and houses an auditorium capable of hosting full-scale theatrical productions and weekly chapels as well as various assemblies and annual school events, including band, choir, and orchestra concerts. The state-of-the-art facility includes a scene shop specially designed for set construction; a black box theater for smaller productions; and dressing rooms. A window-lined art gallery is on one side of the building and features original work from our JK-grade 12 artists.

Bryte Little Efird Media Center

Charlotte Christian opened the renovated Bryte Little Efird Media Center in 2015 which features extensive technology and collaboration zones designed specifically for middle and upper school students. The media center includes a touch screen interactive TV featuring school events; a digital hearth TV; collaborative booth TVs; a SMART technology interactive projector; private meeting space for faculty professional development; and numerous charging stations and work spaces for students to use their MacBooks or work collaboratively on group projects.
 

Renovated Athletic Stadium & Track

In the summer of 2015, the school renovated and replaced the synthetic turf on the athletic field and installed a new track. 

Hendrick Center for Arts and Science

The Hendrick Center for Arts and Science was completed in July 2014 for the opening of the 2014-15 school year. It is the first building on campus to offer instructional space for students in all grade levels. It includes more than 20,000 square feet and houses the lower school STEM lab, media center, technology lab, and music classroom; middle school Latin classroom; orchestra studio; three visual arts studios; an upper school math and science classroom; and an Academic Services Center which includes offices for the school’s director of academics, academic services coordinator, lower school principal, tutoring offices, and the school’s receptionist. 

Main Parking Lot

The complete renovation of the parking lot took place in the summer of 2013. The new parking areas were completed just in time for the first day of school for the 2013-14 year. At completion, 65 new and wider spaces were added to campus, and the traffic lanes were improved to provide a more efficient flow of traffic.

Warner Field House & Guy Gym Expansion 

The Warner Field House is a 7,800 square foot facility that was built in conjunction with the expansion to the Guy Gymnasium, both of which broke ground in May of 2012. The field house includes athletic offices; a multipurpose room designed for use by wrestling, cheerleading, fine arts, and large group meetings; and locker rooms for football, lacrosse, and wrestling. The facility also includes a classroom that is used for P.E. class lectures, athletic team meetings, and study halls. In addition to the field house, the Guy Gymnasium was expanded by 2,400 square feet to accommodate double court space for basketball and volleyball along with expanded spectator seating.